Ski Industry Gallery

Images of mountain operations and ski area topics.
Most viewed
Doppelmayr_CTEC_-_recommended_oil_for_kissling_VKE_model_gearboxes_on_ski_lift_applications_pg1.jpg
112 views
IMG_20130504_130203_-_Copy.jpg
94 views
Doppelmayr_CTEC_-_recommended_oil_for_kissling_VKE_model_gearboxes_on_ski_lift_applications_pg2.jpg
93 views
Reinstalling_tower_4_after_inspecting_and_splicing_a_new_tower_base_5.jpg
93 views
IMG_20130504_125712_-_Copy.jpg
89 views
Connecting_tower_4_tower_top_3.jpg
89 views
IMG_20130504_122032_-_Copy.jpg
88 views
Connecting_tower_4_tower_top_1.jpg
88 views
1406340483185.jpg
Riblet Gear Box87 viewsShimming out the high speed shaft for proper back lash of spiral bevels.
IMAG0716.jpg
Go Switch - Proximity Switch 87 views
Reinstalling_tower_4_after_inspecting_and_splicing_a_new_tower_base_3.jpg
87 views
Reinstalling_tower_4_after_inspecting_and_splicing_a_new_tower_base_4.jpg
87 views
IMAG0413.jpg
Lift Maintenance Crew Testing Out A Chair86 views
IMG_20130503_162356_-_Copy.jpg
86 views
Measures_for_tighting__soft__screwed_connections_pg3.jpg
86 views
IMAG0714.jpg
Proximity switch with plastic bracket 85 viewsWent from opening at a 1/4" to opening at a 1/2".
photo_2.JPG
85 viewsHauling snow from parking lots to fill early season holes on hill.
1406340482935.jpg
High Speed Shaft 84 views
IMAG0713.jpg
proximity switch bracket interference 84 viewsAluminium bracket that was causing interference.
Reinstalling_tower_4_after_inspecting_and_splicing_a_new_tower_base_2.jpg
84 views
IMG_20130503_162609_-_Copy.jpg
83 views
IMAG0304.jpg
82 views
IMAG0346.jpg
82 views
IMG_20130503_162325_-_Copy.jpg
82 views
Reinstalling_tower_4_after_inspecting_and_splicing_a_new_tower_base_1.jpg
82 views
1406340482391.jpg
Shims between high speed shaft and gear box81 views
IMG_20130504_125707_-_Copy.jpg
81 views
Connecting_tower_4_tower_top_2.jpg
81 views
425 files on 16 page(s) 1